{"id":760928,"date":"2018-12-26T12:55:04","date_gmt":"2018-12-26T18:55:04","guid":{"rendered":"https:\/\/www.ktbb.com\/post\/?p=760928"},"modified":"2018-12-27T13:21:44","modified_gmt":"2018-12-27T19:21:44","slug":"tylers-projects-update","status":"publish","type":"post","link":"https:\/\/ktbb.com\/post\/?p=760928","title":{"rendered":"Tyler&#8217;s Projects Update"},"content":{"rendered":"<p><a href=\"https:\/\/www.ktbb.com\/post\/wp-content\/media\/2018\/11\/cityoftyler.png\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.ktbb.com\/post\/wp-content\/media\/2018\/11\/cityoftyler-150x150.png\" alt=\"\" width=\"150\" height=\"150\" class=\"alignleft size-thumbnail wp-image-753506\" \/><\/a>TYLER &#8211; Here is a summary of the city projects now underway in Tyler. Schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. <\/p>\n<p>2018 Asphalt Enhancement (Overlay) Project<br \/>\n&#8211; Location: Various Streets throughout the City of Tyler<br \/>\n&#8211; Contractor: Reynolds and Kay, Ltd.<br \/>\n&#8211; Cost: $4,292,993.10<br \/>\n&#8211; Funding Source: Half Cent, TWU Capital Fund, General Fund<br \/>\n&#8211; Impact to Traffic: Traffic will usually be directed around work areas by flagging operations<br \/>\n&#8211; Anticipated Construction Completion: April 2019<br \/>\n&#8211; Status: Construction is on-going.<!--more--><\/p>\n<p>GRWTP Backwash Pump Station and Clearwell Baffles<br \/>\n&#8211; Location: Golden Road Water Treatment Plant<br \/>\n&#8211; Contractor: Gracon Construction<br \/>\n&#8211; Cost: $4,705,000<br \/>\n&#8211; Funding Source: TWU Revenue Bonds<br \/>\n&#8211; Impact to Traffic: None anticipated<br \/>\n&#8211; Anticipated Construction Completion Date: February 2019<br \/>\n&#8211; Status: All work is complete except for a tie-in at the filters. Water leaks have been discovered in pipe coming from filters. Engineer and contractor are developing a plan to address the repairs.<\/p>\n<p> Bascom Road Water Line Extension<br \/>\n &#8211; Location: Bascom Road from Shiloh to Southwood<br \/>\n -Contractor: Reynolds &#038; Kay, Ltd<br \/>\n &#8211; Cost: $251,515<br \/>\n&#8211; Funding Source: TWU Revenue Bonds<br \/>\n   &#8211; Impact to Traffic: TBD<br \/>\n&#8211; Anticipated Construction Completion Date: TBD<br \/>\n&#8211; Status: Work is temporarily on hold pending acquisition of a temporary construction easement for the boring contractor.<\/p>\n<p>Sewer Improvements (Pinecrest to Tanglewood)<br \/>\n&#8211; Location: Pinecrest to Tanglewood<br \/>\n&#8211; Contractor: A.E. Shull &#038; Company<br \/>\n&#8211; Cost: $233,375.00<br \/>\n&#8211; Funding Source: TWU Utility Fund<br \/>\n&#8211; Impact to Traffic: None anticipated<br \/>\n&#8211; Anticipated Construction Completion Date: May 2019<br \/>\n&#8211; Status: Contractor has begun clearing right-of-way but was temporarily delayed due to weather.<\/p>\n<p>Runway 4\/22 Rehab Project 4<br \/>\n&#8211; Location: Tyler Pounds Field<br \/>\n&#8211; Contractor: SpawGlass<br \/>\n&#8211; Cost: $10,848,806<br \/>\n&#8211; Funding Source: 90% FAA Grant and 10% Half Cent Sales Tax<br \/>\n&#8211; Impact to Traffic: None anticipated<br \/>\n&#8211; Anticipated Construction Completion Date: November 2018<br \/>\n&#8211; Status: Work is complete.<\/p>\n<p>Legacy Trails<br \/>\n&#8211; Location: Old Jacksonville to Cumberland Road and Gresham<br \/>\n&#8211; Contractor: Reynolds and Kay, Ltd.<br \/>\n&#8211; Cost: $4,600,000<br \/>\n&#8211; Funding Source: Grant\/Half Cent (70\/30)<br \/>\n&#8211; Impact to Traffic: Off system, minimal lane closures<br \/>\n&#8211; Anticipated Construction Completion Date: June 2019<br \/>\n&#8211; Status: East trail is complete along Old Jacksonville Hwy and Dueling Oaks.<\/p>\n<p>West trail is about 90% complete. North trailhead is complete pending landscaping. Middle Trailhead is underway and South Trailhead is complete.<\/p>\n<p>Courtney-Miller Drainage Improvements<br \/>\n&#8211; Location: Golden Road, Courtney Drive and Miller Drive Area<br \/>\n&#8211; Contractor: Reynolds and Kay, Ltd.<br \/>\n&#8211; Cost: $2,035,121<br \/>\n&#8211; Funding Source: Half Cent<br \/>\n&#8211; Impact to Traffic: Golden Road, Courtney Drive and Miller Drive will be closed at different times and traffic will be detoured<br \/>\n&#8211; Anticipated Construction Completion Date: August 2019<br \/>\n&#8211; Status: Culvert installation at Golden Road is complete. Remaining construction is underway.<\/p>\n<p>2018 CDBG Curb and Gutter &#8211; Harmony (Border to Whitten)<br \/>\n&#8211; Location: Harmony Street from Border Ave to Whitten Ave<br \/>\n&#8211; Contractor: South Texas Illumination<br \/>\n&#8211; Cost: $43,331.50<br \/>\n&#8211; Funding Source: CDBG<br \/>\n&#8211; Impact to Traffic: Traffic will be usually be rerouted by flaggers<br \/>\n&#8211; Anticipated Construction Completion Date: December 2018<br \/>\n&#8211; Status: Project is under construction. Electric pole has been moved and contractor will be starting work on December 10.<\/p>\n<p>Fleishel Drainage Improvements<br \/>\n&#8211; Location: Fleishel Avenue from 8   th Street to Skyline Street<br \/>\n&#8211; Contractor: Miller Construction<br \/>\n&#8211; Cost: $999,134<br \/>\n&#8211; Funding Source: Half-Cent<br \/>\n&#8211; Impact to Traffic: Fleishel from 8th to Skyline will be closed through most of construction<br \/>\n&#8211; Anticipated Construction Completion Date: September 2019<br \/>\n&#8211; Status: Pre-construction meeting held Dec 3. Construction start scheduled for early January. Fleishel from 8th to Skyline will be closed through most of construction.<\/p>\n<p>Fire Station No. 1<br \/>\n&#8211; Location: M.L. King Jr. Blvd (old Fire Station No. 4)<br \/>\n&#8211; Contractor: Jacobe Brothers<br \/>\n&#8211; Cost: $ 4,828,410<br \/>\n&#8211; Funding Source: Half-Cent<br \/>\n&#8211; Impact to Traffic: TBD<br \/>\n&#8211; Anticipated Construction Completion Date: September 2019<br \/>\n&#8211; Status: Construction contracts complete. Scheduling a pre-construction meeting with the contractor.<\/p>\n<p>Fire Station No. 4<br \/>\n&#8211; Location: Cherry Hill just south of Cumberland Rd<br \/>\n&#8211; Contractor: Garrett and Associates<br \/>\n&#8211; Cost: $2,989,714<br \/>\n&#8211; Funding Source: Half-Cent<br \/>\n&#8211; Impact to Traffic: TBD<br \/>\n&#8211; Anticipated Construction Completion Date: October 2019<br \/>\n&#8211; Status: Construction contracts complete. Scheduling a pre-construction meeting with the contractor.<\/p>\n<p>Sunnybrook Culvert Replacement (at Robertson)<br \/>\n&#8211; Location: Sunnybrook at Robertson Rd<br \/>\n&#8211; Contractor: Reynolds &#038; Kay, Inc.<br \/>\n&#8211; Cost: $597,687<br \/>\n&#8211; Funding Source: Half-Cent<br \/>\n&#8211; Impact to Traffic: TBD<br \/>\n&#8211; Anticipated Construction Completion Date: June 2019<br \/>\n&#8211; Status: Contracts have been signed and work is anticipated to start in January.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TYLER &#8211; Here is a summary of the city projects now underway in Tyler. Schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. 2018 Asphalt Enhancement (Overlay) Project &#8211; Location: Various Streets throughout the City of Tyler &#8211; Contractor: Reynolds and Kay, Ltd. &#8211; Cost: $4,292,993.10 &#8211; Funding Source: &hellip; <a href=\"https:\/\/ktbb.com\/post\/?p=760928\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Tyler&#8217;s Projects Update<\/span><\/a><\/p>\n","protected":false},"author":12,"featured_media":753506,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[177],"tags":[],"class_list":["post-760928","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local-news-archive-archives"],"publishpress_future_action":{"enabled":false,"date":"2026-06-08 01:55:01","action":"change-status","newStatus":"trash","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts\/760928","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=760928"}],"version-history":[{"count":2,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts\/760928\/revisions"}],"predecessor-version":[{"id":760930,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts\/760928\/revisions\/760930"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/media\/753506"}],"wp:attachment":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=760928"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=760928"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=760928"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}