{"id":1534192,"date":"2026-08-20T03:19:55","date_gmt":"2026-08-20T08:19:55","guid":{"rendered":"https:\/\/ktbb.com\/post\/?p=1534192"},"modified":"2026-08-22T08:01:09","modified_gmt":"2026-08-22T13:01:09","slug":"lawmakers-meet-on-data-center-audit","status":"publish","type":"post","link":"https:\/\/ktbb.com\/post\/?p=1534192","title":{"rendered":"Lawmakers meet on data center audit"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/ktbb.com\/post\/wp-content\/media\/2026\/07\/DATACEMTER-200x200.png\" alt=\"\" width=\"200\" height=\"200\" class=\"alignnone size-medium wp-image-1525827\" srcset=\"https:\/\/ktbb.com\/post\/wp-content\/media\/2026\/07\/DATACEMTER-200x200.png 200w, https:\/\/ktbb.com\/post\/wp-content\/media\/2026\/07\/DATACEMTER.png 450w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/>EAST TEXAS \u2014 Just two weeks after Texas Governor Greg Abbott ordered an audit of data centers, the Texas House of Representatives met with electrical and utility companies to learn what requirements are being placed on the new tech. According to our news partner KETK, Governor Abbott laid out how data center companies should operate in Texas during a campaign stop in Bullard in June. Abbott later backed up his stance by ordering the Electric Reliability Council of Texas (ERCOT) and the Public Utility Commission of Texas (PUC) to verify that companies meet the governor\u2019s requirements.<\/p>\n<p>\u201cThe governor, before we move forward, wants us to validate that everything those companies have attested to is truthful and honest before we basically punch their ticket,\u201d PUC Chair Thomas Gleeson said.<\/p>\n<p>The governor\u2019s audit outlines that every data center running through ERCOT\u2019s interconnection process must disclose:<\/p>\n<p>    The extent to which data centers are paying their own way or depending on the ERCOT grid for that power<br \/>\n    The extent to which data centers are bringing their own water and reusing their own water as opposed to using water needed by local communities<br \/>\n    The extent to which data centers are using measures to reduce impacts on neighboring property owners and communities<!--more--><\/p>\n<p>\u201cWhat we\u2019ll do is ask for that information through a survey; it will have to be attested to by those that are providing it,\u201d President and CEO of ERCOT Pablo Vegas said.<\/p>\n<p>Then they\u2019ll provide that data to lawmakers so they can begin writing new legislation.<\/p>\n<p>\u201cWe\u2019ll basically gather that data; you will get descriptive statistics out of that,\u201d Gleeson said. \u201cHow much in tax abatements, how much water.\u201d<\/p>\n<p>Dozens of Texans shared their concerns Wednesday with lawmakers, including Stacy Farmer from Henderson County, who was part of the community pushback against a proposed data center near Cedar Creek, which led developers to pull out of the project.<\/p>\n<p>\u201cIt was time-consuming, money-consuming, energy-consuming, and community pushback, not policy,\u201d Farmer said.<\/p>\n<p>Farmer says that while it was a win for those against data centers, she believes the fight is far from over.<\/p>\n<p>\u201cTens of thousands of Texans are fighting day and night to protect our land, our air, our water, our grid and our way of life,\u201d Farmer said.<\/p>\n<p>No legislative action is underway right now, but Farmer hopes Texans will keep pushing to be heard and that their elected representatives will listen.<\/p>\n<p>\u201cWe the people need better than what is happening here in Texas,\u201d Farmer said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>EAST TEXAS \u2014 Just two weeks after Texas Governor Greg Abbott ordered an audit of data centers, the Texas House of Representatives met with electrical and utility companies to learn what requirements are being placed on the new tech. According to our news partner KETK, Governor Abbott laid out how data center companies should operate &hellip; <a href=\"https:\/\/ktbb.com\/post\/?p=1534192\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Lawmakers meet on data center audit<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":1525827,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[177],"tags":[],"class_list":["post-1534192","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local-news-archive-archives"],"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts\/1534192","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1534192"}],"version-history":[{"count":0,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts\/1534192\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/media\/1525827"}],"wp:attachment":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1534192"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1534192"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1534192"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}