{"id":1364472,"date":"2024-10-24T06:46:47","date_gmt":"2024-10-24T11:46:47","guid":{"rendered":"https:\/\/ktbb.com\/post\/?p=1364472"},"modified":"2024-10-26T22:39:04","modified_gmt":"2024-10-27T03:39:04","slug":"tyler-approves-4-4m-contract-to-improve-drainage","status":"publish","type":"post","link":"https:\/\/ktbb.com\/post\/?p=1364472","title":{"rendered":"Tyler approves $4.4M contract to improve drainage"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-thumbnail wp-image-1364479\" src=\"https:\/\/ktbb.com\/post\/wp-content\/media\/2024\/10\/tylerdrain-225x139.png\" alt=\"\" width=\"225\" height=\"139\" srcset=\"https:\/\/ktbb.com\/post\/wp-content\/media\/2024\/10\/tylerdrain-225x139.png 225w, https:\/\/ktbb.com\/post\/wp-content\/media\/2024\/10\/tylerdrain-550x340.png 550w, https:\/\/ktbb.com\/post\/wp-content\/media\/2024\/10\/tylerdrain.png 691w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/>TYLER \u00e2\u20ac\u201c The City of Tyler approved a $4,429,876 Capital Improvement Project on Wednesday to address drainage and erosion. According to our news partner KETK, the project will focus on improving drainage on Keaton Avenue which they say \u00e2\u20ac\u0153has been a focus for several years due to erosion and flooding residents have experienced.\u00e2\u20ac\u009d The contract with Reynolds and Kay was approved on Wednesday.<\/p>\n<p>\u00e2\u20ac\u0153The project will focus on a drainage area that collects stormwater from approximately 248 acres near Pollard Park and extends towards Donnybrook Avenue and East Southeast Loop 323. Stormwater is precipitation that does not seep into the ground but runs off into our storm drain systems, where it eventually flows into our streams and lakes,\u00e2\u20ac\u009d the City of Tyler said. <!--more--><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1364473\" src=\"https:\/\/ktbb.com\/post\/wp-content\/media\/2024\/10\/Keaton20Avenue20project20location-550x350.webp\" alt=\"\" width=\"550\" height=\"350\" srcset=\"https:\/\/ktbb.com\/post\/wp-content\/media\/2024\/10\/Keaton20Avenue20project20location-550x350.webp 550w, https:\/\/ktbb.com\/post\/wp-content\/media\/2024\/10\/Keaton20Avenue20project20location-225x144.webp 225w, https:\/\/ktbb.com\/post\/wp-content\/media\/2024\/10\/Keaton20Avenue20project20location-768x490.webp 768w, https:\/\/ktbb.com\/post\/wp-content\/media\/2024\/10\/Keaton20Avenue20project20location.webp 859w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>The city said that these are the steps being taken to improve drainage in the area:<\/p>\n<p>Drainage will be diverted down Keaton Avenue utilizing two reinforced concrete boxes, reducing the volume of stormwater trying to use the natural channel between Bain Place and Keaton Avenue<br \/>\nThe improved channel from Shepherd Lane to Wynwood Drive will be enlarged and rebuilt, increasing the capacity<br \/>\nThe natural channel between Bain Place and Keaton Avenue will be improved in the lower section near Shepherd Lane<br \/>\nAn improved channel from Fry Avenue to the improved channel between Shepherd Lane and Wynwood Drive will be rebuilt, increasing capacity<br \/>\nThe utilities in Keaton Avenue from the diversion to Shepherd Lane will be replaced while the roadway is open to install the reinforced concrete boxes<\/p>\n<p>The project is being funded by the American Rescue Plan Act and is expected to be completed by the end of 2025.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TYLER \u00e2\u20ac\u201c The City of Tyler approved a $4,429,876 Capital Improvement Project on Wednesday to address drainage and erosion. According to our news partner KETK, the project will focus on improving drainage on Keaton Avenue which they say \u00e2\u20ac\u0153has been a focus for several years due to erosion and flooding residents have experienced.\u00e2\u20ac\u009d The contract &hellip; <a href=\"https:\/\/ktbb.com\/post\/?p=1364472\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Tyler approves $4.4M contract to improve drainage<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":1364476,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"https:\/\/ktbb.com\/post\/wp-content\/media\/2024\/10\/tylerdrain-225x139.png","fifu_image_alt":"","footnotes":""},"categories":[177],"tags":[],"class_list":["post-1364472","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local-news-archive-archives"],"publishpress_future_action":{"enabled":false,"date":"2026-06-11 11:30:11","action":"change-status","newStatus":"trash","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"fifu_image_url":"https:\/\/ktbb.com\/post\/wp-content\/media\/2024\/10\/tylerdrain-225x139.png","_links":{"self":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts\/1364472","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1364472"}],"version-history":[{"count":2,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts\/1364472\/revisions"}],"predecessor-version":[{"id":1364483,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts\/1364472\/revisions\/1364483"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/media\/1364476"}],"wp:attachment":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1364472"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1364472"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1364472"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}