{"id":1143758,"date":"2022-07-13T14:47:21","date_gmt":"2022-07-13T19:47:21","guid":{"rendered":"https:\/\/ktbb.com\/post\/?p=1143758"},"modified":"2022-07-14T14:47:00","modified_gmt":"2022-07-14T19:47:00","slug":"council-address-wastewater-sewer-issues-plans-new-traffic-signal","status":"publish","type":"post","link":"https:\/\/ktbb.com\/post\/?p=1143758","title":{"rendered":"Council address wastewater\/sewer issues, plans new traffic signal"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/ktbb.com\/post\/wp-content\/media\/2022\/07\/cityoftyler-175x200.png\" alt=\"\" width=\"175\" height=\"200\" class=\"alignnone size-medium wp-image-1143759\" srcset=\"https:\/\/ktbb.com\/post\/wp-content\/media\/2022\/07\/cityoftyler-175x200.png 175w, https:\/\/ktbb.com\/post\/wp-content\/media\/2022\/07\/cityoftyler-306x350.png 306w, https:\/\/ktbb.com\/post\/wp-content\/media\/2022\/07\/cityoftyler.png 486w\" sizes=\"auto, (max-width: 175px) 100vw, 175px\" \/>TYLER &#8212;  The Tyler City Council Wednesday authorized the city manager to execute construction contracts for improvements to the Southside and Westside Wastewater Treatment Plants and sewer system upgrades.  The wastewater treatment contract comes to about $3.66 million, with the sewer system pact totaling some $3.32 million. It&#8217;s all being done under a 2017 consent decree with the EPA to address what&#8217;s termed the city\u00e2\u20ac\u2122s aging wastewater collection system and resulting discharges. Meantime, some news for drivers as the council slates a new traffic signal for West Grande Boulevard and Old Noonday Road, the product of a recent traffic signal study.  The design process is estimated to take about six months, and the construction process is estimated to take about a year. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>TYLER &#8212; The Tyler City Council Wednesday authorized the city manager to execute construction contracts for improvements to the Southside and Westside Wastewater Treatment Plants and sewer system upgrades. The wastewater treatment contract comes to about $3.66 million, with the sewer system pact totaling some $3.32 million. It&#8217;s all being done under a 2017 consent &hellip; <a href=\"https:\/\/ktbb.com\/post\/?p=1143758\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Council address wastewater\/sewer issues, plans new traffic signal<\/span><\/a><\/p>\n","protected":false},"author":62,"featured_media":1143762,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"https:\/\/ktbb.com\/post\/wp-content\/media\/2022\/07\/cityoftyler-175x200.png","fifu_image_alt":"Council address wastewater\/sewer issues, plans new traffic signal","footnotes":""},"categories":[177],"tags":[],"class_list":["post-1143758","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local-news-archive-archives"],"publishpress_future_action":{"enabled":false,"date":"2026-06-24 04:37:30","action":"change-status","newStatus":"trash","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"fifu_image_url":"https:\/\/ktbb.com\/post\/wp-content\/media\/2022\/07\/cityoftyler-175x200.png","fifu_image_alt":"Council address wastewater\/sewer issues, plans new traffic signal","_links":{"self":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts\/1143758","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/users\/62"}],"replies":[{"embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1143758"}],"version-history":[{"count":1,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts\/1143758\/revisions"}],"predecessor-version":[{"id":1143760,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/posts\/1143758\/revisions\/1143760"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=\/wp\/v2\/media\/1143762"}],"wp:attachment":[{"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1143758"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1143758"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ktbb.com\/post\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1143758"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}