TxDOT Road Projects

Posted/updated on: March 10, 2015 at 2:40 am

TxDOT signSMITH COUNTY – The Texas Department of Transportation (TxDOT) maintenance crews in Tyler were due today to conduct mill and inlay work on Interstate Highway 20 eastbound at Mile Markers 570-571. The outside lane will be closed so look for message boards and other traffic control to help you through the work zone. On Tuesday, crews will be milling the east end of Farm Road 2813 under one way traffic with flaggers. Wednesday’s work consists of placing an overlay on FM 2813 from U.S. Highway 69 to a mile west of U.S. 69. Expect a lane closure with flaggers providing traffic control.

Here’s a look at some of the construction projects underway in Smith County:
State Highway 31East Widening Project
*Limits: From FM 757 to FM 1639
*Contractor: Reynolds & Kay, LTD
*Cost: $7.8 million
This project consists of widening SH 31 to add passing lanes for multiple sections of roadway in both the eastbound and westbound directions. Once the widening is
complete, a seal coat and final surface will be applied. Motorists should expect delays as wells as a daily construction speed limit of 60 mph when work is being performed on this 18-month job.

State Highway 31East Widening Project
*Limits: From FM 850 to FM 757
*Contractor: East Texas Bridge, Inc.
*Cost: $3.4 million
This portion of Farm Road 850 east of Tyler to Farm Road 757 is also being widened with a scheduled completion date set for next spring.

Off-System Bridge Replacement Project
*Limits: County Road (CR) 46 at Prairie Creek Tributary
*Contractor: East Texas Bridge, Inc.
*Cost: $490,000
CR 46 remains closed while the outdated bridge is replaced. Motorists must take alternate routes to reach their destinations. The work is expected to be completed in about three months. The new bridge at Village Creek on CR 448 opened to traffic in February.

Loop 323
*Limits: Tyler’s West Loop and SH 31
*Contractor: Longview Bridge and Road, Ltd.
This widening and railroad bridge replacement project continues with the contractor constructing the shoofly bridge. Motorists should expect intermittent delays during this work. The speed limit has been reduced to 45 mph from SH 64 to Shaw Street on Loop 323.

State Highway 64
*Limits: from Chapel Hill to Arp
*Contractor: Drewery Construction
*Cost: $3.9 million
TxDOT is asking motorists to use extra caution and watch for flaggers providing traffic control when traveling through this work zone. This Super 2 widening project continues and consists of clearing and grading. The dirt work is currently being performed from County Road 299 to just west of Arp where the work zone speed limit is set at 60 mph. This is a daily speed zone reduction and will only be posted when workers are present. Expect lane closures.

GREGG COUNTY – Texas Department of Transportation (TxDOT) maintenance crews in Longview, along with the Special Crews, will spend several days placing a fog seal on Farm Road 349 from State Highway 149 to State Highway 322. Operations will then move to Loop 281 from Tryon Road to the Harrison County line to end out the week. Elsewhere, a crew will be crack sealing on State Highway 31 and Farm Road 2205. This is a moving operation so be prepared to respond as directed by flaggers providing traffic control.

Construction projects in Gregg County include:
State Highway 31 Landscape Project
*Limits: 0.3 miles north of FM 2205 (Grace Creek) to 0.2 miles south of U.S. 80 (Cotton) in Longview
*Contractor: South Texas Illuminations, LLC
*Cost: $281,249.70
Groundbreaking ceremonies were held last week on this SH 31 landscape project. The contractor has set the barricades and work could start this week. It is not expected to impact traffic.

The project comes as a result of the city winning one of 10 Governor’s Community Achievement Awards presented by Keep Texas Beautiful through its partnership with TxDOT, which allocates $2,000,000 a year as landscape incentives to competing communities based on population. Landscape incentives are given for outstanding work in areas of litter prevention and cleanup, public awareness, beautification and property improvement, solid waste management, illegal dumping and enforcement and education.

Farm Road 2275 George Richey Extension (Segments II & III)
*Limits: McCann Road to U.S. 259
*Contractor: East Texas Bridge, Inc.
The clearing between Judson Road and Airline Road continues. Excavation, embankment, bridge construction, storm drain and other work is ongoing between McCann Road and Judson Road. This is new location construction work and is not expected to impact traffic.

Loop 281 at Farm Road 2087 Overpass
*Limits: SH 31 to approximately one mile south of SH 31
*Contractor: Longview Bridge and Road, Ltd.
This project is in Phase III of construction with traffic moved off the existing loop onto the detours. The contractor is placing drill shafts for the bridge, constructing a temporary retaining wall, the bridge headers and storm drain. Traffic can expect some delays during the peak evening hours. Caution advised during travel through this work zone.

State Highway 42
*Limits: From SH 31 north to I-20
*Contractor: Reynolds & Kay, Ltd.
Construction has been postponed as the contractor works on plans to build a turn lane at Hillcrest Road. When it resumes, the contractor will be conducting curb and gutter and guardrail work. Drivers can expect minimal impacts at this time. Nighttime operations could be implemented on this job at some point.

Interstate Highway 20 Dynamic Message Signs (DMS)
Location
*East of FM 1255 westbound – Van Zandt County
*West of FM 849 eastbound – Smith County
*Derrick Park westbound – Smith County
Contractor: Highway Intelligent Traffic Solutions Corp.
The contractor has installed these signs and expects to wrap up the project soon.

ANDERSON COUNTY – Texas Department of Transportation (TxDOT) maintenance crews in Palestine plan to continue edge of road repairs on Farm Road 1137 this week, and then move to Farm Road 837 toward Brushy Creek to perform base repair work. Pay attention when driving in these areas and expect daytime lane closures with flaggers directing you through the work zones.

CHEROKEE COUNTY – Texas Department of Transportation (TxDOT) maintenance crews in Jacksonville are doing base repairs on Farm Road 13 between Troup and Price, while the Rusk crew is performing edge of road repairs at locations around the county. This work is expected to take about two weeks to complete. Watch for flaggers directing you through the work zones.

HENDERSON COUNTY – Texas Department of Transportation maintenance crews in Athens this week are making edge repairs on Farm Road 607 from Loop 60 to Farm Road 317, and addressing drainage issues at various locations throughout the county. Flaggers will provide traffic control in these work zones.

Elsewhere, Big Creek Construction, the contractor for the Farm Road 317 widening project, is dressing slopes and conduct seeding on this job which stretches from Farm Road 314 to Farm Road 607.

RUSK COUNTY – Texas Department of Transportation maintenance crews in Henderson will be doing pothole and edge repairs around the county. Expect day time lane closures in varying locations.

Work on the State Highway 64 construction project continues in Rusk County:
SH 64
*Limits: 0.173 miles west of BU 64E (N. Marshall St.) east to 0.2 miles west of U.S. 79 (Traffic Star)
*Contractor: Lonestar Equipment Company, Inc.
The impact to traffic is minimal on this $2.1 million construction project on SH 64 in Henderson. The contractor is currently building the retaining wall. The project started in August 2013 and has an expected completion date of summer 2015. It consists of widening the existing two-lane roadway and constructing a four-lane facility along with a continuous Left Turn Lane. The contractor will perform the majority of the work outside the existing travel lanes.

VAN ZANDT COUNTY – Texas Department of Transportation maintenance crews in Canton are continuing pothole repairs and other maintenance. Daytime lane closures are possible with flaggers directing traffic. Construction projects in Van Zandt County are progressing as follows:

Off-System Bridge Replacement Projects
Locations:
*County Road (CR) 2702 at Lacy Fork Tributary
*County Road (CR) 2129 at Flat Creek
Contractor: Longview Bridge and Road, Ltd.
Cost: $1.02 million
Both of these roads remain closed at the bridges with clean up underway and should open in the spring.

State Highway 198 Widening Project
*Limits: from SH 243 in Canton southwest to 0.4 miles northeast of FM 316 near Phalba
*Contractor: Big Creek Construction, Ltd.
*Cost: $5 million
Work resumes this week to widen State Highway 198.

Farm Road 314 Widening Project
*Limits: from I-20 to the Van Zandt/Henderson County line
*Contractor: A.L. Helmcamp, Inc.
*Cost: $11.9 million
Culvert work is being conducted on this project between SH 64 and I-20.

WOOD COUNTY – Texas Department of Transportation crews in Mineola plan to spend the week making pothole repairs in addition to removing a beaver dam on U.S. Highway 69 about a half mile north of State Highway37/Spring Lake. This work will take a couple of days to conduct. Expect lane closures.

The U.S. 69 widening project in Mineola continues from Loop 564 in Mineola to Farm Road 779 in Golden.

Elsewhere, preparations are underway for the start of a new construction project on State Highway 37 from Farm Road 2088 in Quitman to 0.4 miles south of Farm Road 515 in Winnsboro. More details to come on this project.



Advertisement
Advertisement