TYLER — Tyler Water Utilities is performing smoke testing, as part of the Consent Decree, to help locate breaks and defects to improve the City’s wastewater system from Monday, Jan. 12 through Friday, Jan. 16. The testing will be conducted by Pipeline Analysis from Cumberland Road, Locklear Lane, Paluxy Drive and South Broadway Avenue.
During the process, air and smoke will be blown into the sanitary sewer system in the street to monitor where smoke escapes the system. White smoke will exit through vent pipes on the roofs of residences and through any sewer line breaks in the ground. The smoke is non-toxic, leaves no residue and does not create any fire hazards. Continue reading TWU to conduct smoke testing this week
LONGVIEW – Longview City Council officially approved a contract to repair the public pool at the Paula Martin Jones recreation center on Thursday. The pool first closed in March of 2025 but was closed again after leaking issues continued in the pool’s gutter system. At their meeting on Thursday, city council approved a $417,000 contract with Sunbelt Pools, Inc. of Dallas to repair the pool.

